JustPermitted PlaybookFAQGet Daily Alerts

Facility Solutions Group — Recent Permit Activity in Austin, TX

Facility Solutions Group pulled 19 commercial building permits in Austin, TX recently, totaling — in reported project value. Work spans: Electrical, Renovation & New Construction, HVAC & Mechanical, Signage, Windows, Doors & Glazing.

19recent permits —total reported value
IssuedProjectValueScore
2026-11-03 Eplan review: remodel labs and break area - 1st floor
6433 CHAMPION GRANDVIEW WAY BLDG 2 AUSTIN
—40
2026-10-28 Eplan: commercial expedited review - interior remodel to existing admin areas to create lab space (800 000 sf).
500 W 2ND ST UNIT 2300 AUSTIN
—40
2026-10-19 Repairing exposed wire on ct cabinet
2420 RIDGEPOINT DR AUSTIN
—35
2026-10-16 Like for like repair to existing service
2500 RIDGEPOINT DR AUSTIN
—35
2026-10-13 Eplan review: remodel labs and break area - 3rd floor for building 2
6433 CHAMPION GRANDVIEW WAY BLDG 2 AUSTIN
—40
2026-10-13 Eplan review: remodel labs and break area - 4th floor for building 2
6433 CHAMPION GRANDVIEW WAY BLDG 2 AUSTIN
—40
2026-10-13 Eplan review: remodel labs and break area - 2nd floor for building 2
6433 CHAMPION GRANDVIEW WAY BLDG 2 AUSTIN
—40
2026-10-07 Eplan - remodel office and break area - 3rd floor
6433 CHAMPION GRANDVIEW WAY BLDG 1 AUSTIN
—40
2026-10-07 Eplan - remodel for labs servery and it -1st floor.
6433 CHAMPION GRANDVIEW WAY BLDG 1 AUSTIN
—40
2026-10-07 Eplan - remodel office and break area - 4th floor
6433 CHAMPION GRANDVIEW WAY BLDG 1 AUSTIN
—40
2026-10-07 Eplan - remodel office labs training and break area - 2nd floor.
6433 CHAMPION GRANDVIEW WAY BLDG 1 AUSTIN
—40
2026-09-28 Em repairs to city vault fire ***ec to replace electrical equipment/raceways/conductors as needed due to electrical vault incident-hyatt***
300 S CONGRESS AVE AUSTIN
—40
2026-09-22 Fsg will remove a 3 phase meter with a 1 phase meter can.
10205 N LAMAR BLVD AUSTIN
—35
2026-09-08 Eplan: commercial expedited review - interior remodel of dh4 train area to include installing an electric room for upgrading capacity (61130
8025 N IH 35 SVRD NB BLDG 1 AUSTIN
—40
2026-09-03 Install large blade sign (austin*austinau) on south elevation
1900 CROSSING PL BLDG 1 AUSTIN
—40
2026-09-03 Eplan: commercial expedited review - [approved new construction of behavior health hospital located at the texas neuro rehab center campus (
1106 W DITTMAR RD BLDG 30 AUSTIN
—40
2026-09-03 Install of box office sign above ticket window
1900 CROSSING PL BLDG 1 AUSTIN
—40
2026-09-03 Install new canopy sign above main entrance
1900 CROSSING PL BLDG 1 AUSTIN
—40
2026-08-05 Repairs to electrical equipment - no meter work per hyatt dunn
9111 S 1ST ST AUSTIN
—35

Know every contractor's next jobsite — the morning after the permit is filed.
Track all Austin, TX permits — $99/mo