H&M Plumbing — Recent Permit Activity in Austin, TX
H&M Plumbing pulled 23 commercial building permits in Austin, TX recently, totaling — in reported project value. Work spans: Concrete & Masonry, Electrical, Renovation & New Construction, HVAC & Mechanical, Plumbing, Roofing, Windows, Doors & Glazing.
23recent permits
—total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-11-05 | 1st time interior tenant finish-out. 1701 SIMOND AVE UNIT 111 AUSTIN |
— | 35 |
| 2026-10-26 | Interior remodel of flex office space. replace back door with overhead door in same opening - no new paving. 1807 W BRAKER LN BLDG C UNIT 500 AUSTIN |
— | 40 |
| 2026-10-21 | 7 day - renovation to include like for like hvac replacement updated lighting fixtures/switches/outlets and replacement of new cabinets coun 1208 E 52ND ST UNIT 208 AUSTIN |
— | 40 |
| 2026-10-21 | Renovation to include like-for-like hvac replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior 1208 E 52ND ST UNIT 110 AUSTIN |
— | 40 |
| 2026-10-21 | 7 day - renovation to include like for like hvac replacement updated lighting fixtures/switches/outlets and replacement of new cabinets coun 1208 E 52ND ST UNIT 210 AUSTIN |
— | 40 |
| 2026-10-21 | Replace existing hvac units like for like replace existing lighting fixtures switches and outlets as need. replace all existing countertops 1208 E 52ND ST UNIT 206 AUSTIN |
— | 40 |
| 2026-10-21 | 7 day - renovation to include like for like hvac replacement updated lighting fixtures/switches/outlets and replacement of new cabinets coun 1208 E 52ND ST UNIT 209 AUSTIN |
— | 40 |
| 2026-10-21 | Renovation to include like-for-like hvac replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior 1208 E 52ND ST UNIT 109 AUSTIN |
— | 40 |
| 2026-10-21 | Renovation to include like-for-like hvac replacement updated lighting fixtures/switches/ units replacement of all gypsum board and interior 1208 E 52ND ST UNIT 108 AUSTIN |
— | 40 |
| 2026-10-21 | Replace existing hvac units like for like replace existing lighting fixtures switches and outlets as need. replace all existing countertops 1208 E 52ND ST UNIT 106 AUSTIN |
— | 40 |
| 2026-10-06 | Change of use retail to restaurant will be a small primarily grab and go qsr see operations document attached for more detailed information 3115 S 1ST ST UNIT 101A AUSTIN |
— | 35 |
| 2026-09-01 | Interior finish out. (building 5) 8001 CIRCUIT OF THE AMERICAS BLVD UNIT 504 AUSTIN |
— | 35 |
| 2026-08-12 | Qt - interior finish out of office space - ova 8001 CIRCUIT OF THE AMERICAS BLVD UNIT 805 AUSTIN |
— | 35 |
| 2026-08-05 | Interior renovation of five units in a multi-family buildings. construct fire rated partitions between units. convert existing tubs to showe 1206 E 52ND ST BLDG B UNIT 203 AUSTIN |
— | 40 |
| 2026-08-05 | Interior renovation of five units in a multi-family buildings. construct fire rated partitions between units. convert existing tubs to showe 1206 E 52ND ST BLDG B UNIT 201 AUSTIN |
— | 40 |
| 2026-08-05 | Interior renovation of five units in a multi-family buildings. construct fire rated partitions between units. convert existing tubs to showe 1206 E 52ND ST BLDG B UNIT 205 AUSTIN |
— | 40 |
| 2026-08-05 | Interior renovation of five units in a multi-family buildings. construct fire rated partitions between units. convert existing tubs to showe 1206 E 52ND ST BLDG B UNIT 202 AUSTIN |
— | 40 |
| 2026-08-05 | Interior renovation of five units in a multi-family buildings. construct fire rated partitions between units. convert existing tubs to showe 1206 E 52ND ST BLDG B UNIT 204 AUSTIN |
— | 40 |
| 2026-07-30 | Interior finish out 8001 CIRCUIT OF THE AMERICAS BLVD UNIT 509 AUSTIN |
— | 35 |
| 2026-07-30 | Rebuild after fire. will replace damaged frame drywall insulation flooring and paint walls. (suite a - floor 1) 5302 INDIO CV UNIT A AUSTIN |
— | 35 |
| 2026-07-30 | Rebuild after fire. will replace damaged frame drywall insulation flooring and paint walls. (suite c - floor 2) 5302 INDIO CV UNIT D AUSTIN |
— | 35 |
| 2026-07-30 | Rebuild after fire. will replace damaged frame drywall insulation flooring and paint walls. (suite b - floor 1) 5302 INDIO CV UNIT B AUSTIN |
— | 35 |
| 2026-07-30 | Rebuild after fire. will replace damaged frame drywall insulation flooring and paint walls. (suite c - floor 2) 5302 INDIO CV UNIT C AUSTIN |
— | 35 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all Austin, TX permits — $99/mo