Paradigm Commercial, LLC — Recent Permit Activity in Austin, TX
Paradigm Commercial, LLC pulled 15 commercial building permits in Austin, TX recently, totaling — in reported project value. Work spans: Demolition, Electrical, Fencing, Renovation & New Construction, Other, Windows, Doors & Glazing.
15recent permits
—total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-11-05 | Interior non-structural 6200 BRIDGE POINT PKWY BLDG 4 UNIT 300 AUSTIN |
— | 35 |
| 2026-10-27 | Eplan: commercial expedited review - first time finish out for factory/warehouse (95728 sf). 2227 AMBITION WAY UNIT 100 AUSTIN |
— | 35 |
| 2026-10-23 | Eplan: commercial expedited review - interior remodel to existing admin office areas phase 2-3b 3rd floor large restroom and lobby (2170 sf) 1124 S IH 35 SVRD SB UNIT FLR2 AUSTIN |
— | 35 |
| 2026-10-23 | Eplan: commercial expedited review - interior remodel to existing admin office areas phase 2-3a 3rd floor small restroom (275 sf). 1124 S IH 35 SVRD SB UNIT FLR3 AUSTIN |
— | 35 |
| 2026-10-23 | Eplan: commercial expedited review - interior remodel to existing admin office areas phase 2-2 2nd floor areas (14900 sf). 1124 S IH 35 SVRD SB UNIT FLR2 AUSTIN |
— | 35 |
| 2026-10-23 | Eplan: commercial expedited review - interior remodel to existing admin office areas phase 2-1b admin areas (2200 sf). 1124 S IH 35 SVRD SB UNIT FLR1 AUSTIN |
— | 35 |
| 2026-10-23 | Interior remodel - private offices storage room conference rooms reception area and break area 500 W 5TH ST UNIT 1150 AUSTIN |
— | 35 |
| 2026-10-22 | Change of use and remodel to expand pilates studio. this phase remodels 120 and then combines units 120 (1494sf) and 130 (1598sf) 3092 sf to 1600 S 1ST ST UNIT 130 AUSTIN |
— | 35 |
| 2026-10-22 | Interior remodel and expansion of existing pilates studio (unit 130 - 1598sf). phase 1 scope. 1600 S 1ST ST UNIT 130 AUSTIN |
— | 35 |
| 2026-08-19 | Interior remodel new finishes ceilings and lighting and the building out of new office space 6200 BRIDGE POINT PKWY BLDG 4 UNIT 300 AUSTIN |
— | 40 |
| 2026-08-18 | Eplan: commercial expedited review - interior remodel to existing admin office areas (116916 sf) 1124 S IH 35 SVRD SB AUSTIN |
— | 35 |
| 2026-08-13 | 7 day - addition of outdoor natural gas standby generator at existing business - ova 400 W 15TH ST AUSTIN |
— | 40 |
| 2026-07-28 | Interior non structural demolition 2nd floor 1124 S IH 35 SVRD SB AUSTIN |
— | 35 |
| 2026-07-27 | Exterior improvements fence generator pad ramp. plans will be submitted as a deferred submittal. access control requested. (application 2). 9715 BURNET RD BLDG 6 UNIT 500 AUSTIN |
— | 35 |
| 2026-07-27 | Tenant office build-out to shell warehouse building. includes racking per the occupancy classification letter. engineered racking plans will 9715 BURNET RD BLDG 6 UNIT 500 AUSTIN |
— | 35 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all Austin, TX permits — $99/mo