JustPermitted PlaybookFAQGet Daily Alerts

New Fire Protection Permits in Austin, TX — October 2026

22 commercial building permits relevant to fire protection contractors were issued recently in Austin, TX, representing — in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.

22new permits —total reported value —largest project
IssuedProjectValueScore
2026-10-01 Eplan: expedited review - phase 2 - shell renovations to atrium fire suppression system smoke evac system walkways int. storefront paseo and
6801 RIVER PLACE BLVD AUSTIN
—40
2026-09-29 Fire pump and electrical meter replacement in existing office/warehouse building.
8606 WALL ST BLDG 17 AUSTIN
—40
2026-09-29 Fire pump and electrical meter replacement in existing office/warehouse building.
8606 WALL ST BLDG 17 AUSTIN
—40
2026-09-25 Replacement of existing fire pump controller.
9600 N MOPAC EXPY SVRD SB BLDG 2 AUSTIN
—40
2026-09-22 Replacement of existing fire pump controller.
9600 N MOPAC EXPY SVRD SB BLDG 2 AUSTIN
—35
2026-09-11 Upgrading the existing fire pump meter to a 400a ir unit to meet austin energy current requirements with no main disconnect included.
827 W 12TH ST UNIT FIREP AUSTIN
—40
2026-09-04 Eplan: expedited review - new construction 3 unit / 2 level multi-family res. (bldg 8 - 8556 sf) *reviewed per ibc* ***afd - a full resident
1406 W 9TH ST BLDG 8 AUSTIN
—40
2026-09-04 Eplan: expedited review - new construction 2 unit / 3 level multi-family res. (bldg 6 - 7344 sf.) *reviewed per ibc* ***afd - a full residen
1406 W 9TH ST BLDG 6 AUSTIN
—40
2026-09-03 Airport expansion project (city-funded) 2 phase construction- (phase 1) construction of the first portion (south half) of a new 7000-space s
2921 1/2 PRESIDENTIAL BLVD AUSTIN
—40
2026-09-03 Airport expansion project (city-funded) 2 phase construction- (phase 1) construction of the first portion (south half) of a new 7000-space s
2921 1/2 PRESIDENTIAL BLVD AUSTIN
—40
2026-09-01 Electrical service to power sprinkler/irrigation system.
5001 1/2 PECAN SPRINGS RD AUSTIN
—40
2026-08-19 7 day - fire pump fire pump controller jockey pump jockey pump controller replacement - ova
200 LAVACA ST AUSTIN
—35
2026-07-31 Interior remodel replace fire pump controller. scope is only replacing a single piece of fire protection equipment.
13011 MC CALLEN PASS AUSTIN
—40
2026-07-31 Interior remodel replace fire pump controller. scope is only replacing a single piece of fire protection equipment.
13011 MC CALLEN PASS AUSTIN
—40
2026-07-27 Revision to pr 2026-002750 - to include electrical mechanical and fire suppression. no architectural work performed.
115 E ST ELMO RD UNIT 100 AUSTIN
—40
2026-07-09 Renovations to existing public elementary school including finishes reroofing plumbing fixtures hvac envelope sealing new theatre curtain at
11801 TANGLEBRIAR TRL AUSTIN
—40
2026-07-01 Revision to pr 2026-002750 - to include electrical mechanical and fire suppression. no architectural work performed.
115 E ST ELMO RD UNIT A AUSTIN
—40
2026-06-26 Interior remodel only. some sprinklers to be relocated.
200 CONGRESS AVE UNIT 46TX AUSTIN
—40
2026-06-25 Renovations to existing public elementary school including finishes reroofing plumbing fixtures hvac envelope sealing new theatre curtain at
11801 TANGLEBRIAR TRL AUSTIN
—40
2026-06-25 Renovations to existing public elementary school including finishes reroofing plumbing fixtures hvac envelope sealing new theatre curtain at
11801 TANGLEBRIAR TRL AUSTIN
—40
2026-06-24 Renovations to existing public elementary school including finishes reroofing plumbing fixtures hvac envelope sealing new theatre curtain at
11801 TANGLEBRIAR TRL AUSTIN
—40
2026-06-23 Phase 3 conversion of an existing pre-engineered metal building into a temporary nissan showroom with a display area customer lounges and sa
8408 SHOAL CREEK BLVD AUSTIN
—40

Want tomorrow's list at 7am?
Get Fire Protection alerts for Austin, TX — $49/mo