New Plumbing Permits in Austin, TX — October 2026
1132 commercial building permits relevant to plumbing contractors were issued recently in Austin, TX, representing $930,000 in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.
1132new permits
$930,000total reported value
$450,000largest project
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-10-02 | Construction of a two level storage facility in building c at the domain shopping center including a 582 sf ground level and 3959 sf upper l 11410 CENTURY OAKS TER BLDG C UNIT 140 AUSTIN |
— | 40 |
| 2026-10-02 | Tenant improvement remodel of an existing rei retail space. work includes: replacement of retail fixtures finishes electrical and plumbing f 601 N LAMAR BLVD AUSTIN |
— | 40 |
| 2026-10-02 | 7 day - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing cup remove the indo 1201 W 38TH ST AUSTIN |
— | 40 |
| 2026-10-02 | Replace existing gi with a new one 3400 W SLAUGHTER LN AUSTIN |
— | 35 |
| 2026-10-02 | Locked out gas meter by atmos gas put on a gas gauge and shut off the only gas valve at the water heater. put on test for 30 minutes at half 9801 W PARMER LN UNIT 534 AUSTIN |
— | 35 |
| 2026-10-02 | Installation of underground fire line and riser ref: 2025-016431 bp 117 W WILLIAM CANNON DR BLDG 1 AUSTIN |
— | 30 |
| 2026-10-01 | Change of use to restaurant with remodel 902 E 5TH ST UNIT 105 AUSTIN |
— | 40 |
| 2026-10-01 | Eplan: commercial expedited review - interior remodel to existing energy x office building (2575 sf) 2535 RIDGEPOINT DR AUSTIN |
— | 40 |
| 2026-10-01 | Small project - interior remodel. replace all missing fireproofing and fire stopping. affected by new construction with fireproofing to matc 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 200 AUSTIN |
— | 40 |
| 2026-10-01 | Eplan: expedited review - phase 2 - shell renovations to atrium fire suppression system smoke evac system walkways int. storefront paseo and 6801 RIVER PLACE BLVD AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel for a suite expansion including reconfiguration of walls and doors new finishes ceilings and lighting for suite 150 4301 WESTBANK DR BLDG B UNIT 150 AUSTIN |
— | 40 |
| 2026-10-01 | Refresh like and kind for interior finishes drywall ceiling grid lighting paint hvac and cabinetry following asbestos abatement. adding 1 in 4201 SPICEWOOD SPRINGS RD AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel -replace all missing fireproofing and firestopping. affected by new construction with fireproofing to match base building e 11044 RESEARCH BLVD SVRD SB BLDG D UNIT 200 AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel -replace all missing fireproofing and firestopping. affected by new construction with fireproofing to match base building e 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 220 AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel -amenities center. replace all missing fireproofing and firestopping. affected by new construction with fireproofing to mat 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 100 AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel of 2100 sqft of existing boxing gym space. create a new pilates and yoga studio completed in 1 phase. 5300 S MOPAC EXPY SB BLDG 5 UNIT 502 AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel -replace all missing fireproofing and firestopping. affected by new construction with fireproofing to match base building e 11044 RESEARCH BLVD SVRD SB BLDG B UNIT 210 AUSTIN |
— | 40 |
| 2026-10-01 | Emergency repair section of 4 domestic water line at travis high school. work was conducted over the weekend. we would like to have this ins 1211 E OLTORF ST AUSTIN |
— | 40 |
| 2026-10-01 | Eplan: baus review - interior office block fit out of the kaus air cargo building (6711 sf). 9402 FREIGHT LN AUSTIN |
— | 35 |
| 2026-10-01 | Replacement of an existing water heater 40gal gas tank located in an attic 13400 BRIARWICK DR UNIT 1604 AUSTIN |
— | 35 |
| 2026-09-30 | Rerouting ducts of heat pump water heaters in all 2 and 3 bedroom units 92 units total. remove ducts into unit interior and replace with duc 2724 PHILOMENA ST AUSTIN |
— | 40 |
| 2026-09-30 | Interior remodel to split existing bank space #108 into two spaces #100 and #108 and return to shell. 3001 PALM WAY UNIT 108 AUSTIN |
— | 40 |
| 2026-09-30 | Interior alteration of approx. (6400 sf) of existing interior space 2600 VIA FORTUNA UNIT 450 AUSTIN |
— | 40 |
| 2026-09-30 | 7 day - interior remodel of existing office space. no access control. - ova 10415 MORADO CIR BLDG 2 UNIT 300 AUSTIN |
— | 40 |
| 2026-09-30 | Approx. 50 trench to replace main sewer line 5911 SHERIDAN AVE AUSTIN |
— | 35 |
| 2026-09-30 | Replacement of an existing water heater unit # 5101 800 W 38TH ST UNIT 5101 AUSTIN |
— | 35 |
| 2026-09-30 | 1/2 backflow prevention device behind the soda rack 7112 ED BLUESTEIN BLVD SVRD SB UNIT 167 AUSTIN |
— | 35 |
| 2026-09-30 | New commercial building for padel tenant 1205 SHELDON CV BLDG 4 AUSTIN |
— | 35 |
| 2026-09-30 | Approx. 180 ft tunnel replacing all drain pipes under the building 1208 E 52ND ST AUSTIN |
— | 35 |
| 2026-09-30 | 1/2 rpz under drink station for kfc 13435 N US 183 HWY SVRD NB BLDG 2 AUSTIN |
— | 35 |
| 2026-09-30 | New irrigation system ref: 2025-047108 w 3525 FAR WEST BLVD AUSTIN |
— | 30 |
| 2026-09-29 | Interior remodel existing hospital areas. ct-2 (1st floor) 1201 W 38TH ST AUSTIN |
— | 40 |
| 2026-09-29 | Interior remodel for tenant occupancy combining two suites into a single suite. no changes to occupancy type or exterior work. no mechanical 3520 COMSOUTH DR UNIT 120 AUSTIN |
— | 40 |
| 2026-09-29 | Small project - demo of finishes some millwork walls and doors light fixtures and remodel to include new finishes walls doors and millwork. 7600 CHEVY CHASE DR BLDG 2 UNIT 500 AUSTIN |
— | 40 |
| 2026-09-29 | Tenant improvement to existing space (formerly cvs) for dollar tree. scope includes updating finishes and fixtures new rtus at existing loca 4001 W WILLIAM CANNON DR AUSTIN |
— | 40 |
| 2026-09-29 | Interior remodel to split existing bank space #108 into two spaces #100 and #108 and return to shell. 3001 PALM WAY UNIT 100 AUSTIN |
— | 40 |
| 2026-09-29 | Tenant interior renovation of an existing dialysis clinic. work includes updating finishes plumbing mechanical electrical and the addition o 10000 METRIC BLVD UNIT 100 AUSTIN |
— | 40 |
| 2026-09-29 | Interior remodel existing hospital areas. xray 5 1201 W 38TH ST AUSTIN |
— | 40 |
| 2026-09-29 | New construction office warehouse building 3 3500 S SH 130 SVRD SB BLDG 3 AUSTIN |
— | 40 |
| 2026-09-29 | Eplan: commercial expedited review - interior remodel and change of use to personal services scope of work includes undemising two suites in 4616 TRIANGLE AVE BLDG 4 UNIT 405 AUSTIN |
— | 40 |
| 2026-09-29 | Interior remodel of existing vacant space for personal services to include plumbing electrical mechanical. 7415 SOUTHWEST PKWY BLDG 4 UNIT 150 AUSTIN |
— | 40 |
| 2026-09-29 | Remodel to pre loss condition: like to like replacement of existing hvac plumbing electrical and interior finish with no structural modifica 202 NUECES ST UNIT 1202 AUSTIN |
— | 40 |
| 2026-09-29 | Remove and replace existing tea and fountain equipment and chiller. existing c02 to remain. there are no modification to exterior walls park 6111 FM 969 RD AUSTIN |
— | 40 |
| 2026-09-29 | Repair gas leak on kitchen gas bank re-pipe gas outlets with individual isolation shut off valves per appliance 11101 BURNET RD BLDG A UNIT 100 AUSTIN |
— | 35 |
| 2026-09-29 | First-generation construction consisting of new demising walls and a pedestrian bridge for a new suite entry. three suites are shell space/n 1300 E 5TH ST UNIT 115 AUSTIN |
— | 35 |
| 2026-09-28 | Change of use office to personalservice existing commercial suite with non structural interior work only aka paint. no electrical plumbing m 10401 ANDERSON MILL RD UNIT 101 AUSTIN |
— | 40 |
| 2026-09-28 | First-generation tenant build-out of existing shell building for dental office. 7009 E WILLIAM CANNON DR AUSTIN |
— | 40 |
| 2026-09-28 | Etj new construction community kitchen 900sqft 1702 DIGNITY CIR AUSTIN |
— | 40 |
| 2026-09-28 | 7 day - interior remodel of existing office. no access control - ova 812 SAN ANTONIO ST UNIT 500 AUSTIN |
— | 40 |
| 2026-09-28 | Etj new construction community kitchen 900sqft 1502 DIGNITY CIR AUSTIN |
— | 40 |
Want tomorrow's list at 7am?
Get Plumbing alerts for Austin, TX — $49/mo