New Windows, Doors & Glazing Permits in Austin, TX — October 2026
253 commercial building permits relevant to windows, doors & glazing contractors were issued recently in Austin, TX, representing $1,000,001 in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.
253new permits
$1,000,001total reported value
$1,000,000largest project
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-10-02 | 7 day - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing cup remove the indo 1201 W 38TH ST AUSTIN |
— | 40 |
| 2026-10-01 | Eplan: expedited review - phase 2 - shell renovations to atrium fire suppression system smoke evac system walkways int. storefront paseo and 6801 RIVER PLACE BLVD AUSTIN |
— | 40 |
| 2026-10-01 | Interior remodel for a suite expansion including reconfiguration of walls and doors new finishes ceilings and lighting for suite 150 4301 WESTBANK DR BLDG B UNIT 150 AUSTIN |
— | 40 |
| 2026-10-01 | Project consist of remodel of existing apartment complex including loading dock to gym extend the outdoor deck and added dog wash station 901 RED RIVER ST AUSTIN |
— | 40 |
| 2026-10-01 | Refresh like and kind for interior finishes drywall ceiling grid lighting paint hvac and cabinetry following asbestos abatement. adding 1 in 4201 SPICEWOOD SPRINGS RD AUSTIN |
— | 40 |
| 2026-10-01 | 7 day - involves building 2-hour walls around the existing boilers to create a dedicated boiler room inside the existing cup remove the indo 1201 W 38TH ST AUSTIN |
— | 40 |
| 2026-09-30 | Change of use with remodel to existing non-compliant building for indoor music performance cultural services 3404 GOVALLE AVE BLDG 5 AUSTIN |
— | 40 |
| 2026-09-30 | Secondary mechanical contractor- installation of walk-in cooler. evaporator coil run line to condenser. insall cooler doors and shelving. 9515 N LAMAR BLVD UNIT DEL154 AUSTIN |
— | 40 |
| 2026-09-30 | Interior remodel for a suite expansion including reconfiguration of walls and doors new finishes ceilings and lighting for suite 150 4301 WESTBANK DR BLDG B UNIT 150 AUSTIN |
— | 40 |
| 2026-09-30 | Change of use to indoor sports and recreation (computer cafe) 6311 BURNET RD AUSTIN |
— | 35 |
| 2026-09-29 | Small project - demo of finishes some millwork walls and doors light fixtures and remodel to include new finishes walls doors and millwork. 7600 CHEVY CHASE DR BLDG 2 UNIT 500 AUSTIN |
— | 40 |
| 2026-09-28 | M.e. plumbing will excavate an approximately 4 x 4 access area to the right of the front door and tunnel up to approximately 8 beneath the s 2603 JONES RD AUSTIN |
— | 40 |
| 2026-09-27 | Interior remodel for a suite expansion including reconfiguration of walls and doors new finishes ceilings and lighting for suite 150 4301 WESTBANK DR BLDG B UNIT 150 AUSTIN |
— | 40 |
| 2026-09-25 | Existing multifamily property. add outdoor kitchen with 2 electric grills and sink to deck area of a multifamily apartment complex. 2901 BARTON SKWY AUSTIN |
— | 40 |
| 2026-09-24 | Eplan: commercial expedited review - remodel to existing pard recreation - including roof replacement abatement restoration of windows door 200 ARNULFO ALONSO WAY AUSTIN |
— | 40 |
| 2026-09-24 | Emergency service replacing current transformers with high-accuracy cts installing new 36-inch ct enclosure cabinet with double doors and a 8210 BENT TREE RD UNIT 8 AUSTIN |
— | 40 |
| 2026-09-23 | Change of use from retail to create an indoor sports and rec space with accessory concessions. 4501 W BRAKER LN UNIT C AUSTIN |
— | 40 |
| 2026-09-23 | Remodel unit all new mechanicals such as electrical plumbing hvac insulation drywall exterior siding roofing portion chimney exterior brick 2706 WHELESS LN UNIT 104 AUSTIN |
— | 40 |
| 2026-09-23 | Refresh like and kind for interior finishes drywall ceiling grid lighting paint hvac and cabinetry following asbestos abatement. adding 1 in 4201 SPICEWOOD SPRINGS RD AUSTIN |
— | 40 |
| 2026-09-23 | Project consist of remodel of existing apartment complex including loading dock to gym extend the outdoor deck and added dog wash station 901 RED RIVER ST AUSTIN |
— | 40 |
| 2026-09-23 | Project consist of remodel of existing apartment complex including loading dock to gym extend the outdoor deck and added dog wash station 901 RED RIVER ST AUSTIN |
— | 40 |
| 2026-09-23 | Remodel unit all new mechanicals such as electrical plumbing hvac insulation drywall exterior siding roofing portion chimney exterior brick 2706 WHELESS LN UNIT 104 AUSTIN |
— | 40 |
| 2026-09-23 | Repair replace window - window frame. (building 1 - unit 1143 1343 and 1443) 8100 S CONGRESS AVE BLDG 1 AUSTIN |
— | 35 |
| 2026-09-22 | Repair existing 400a 120/240v 3-phase ct-metered electrical service. install retrofit door on existing ct enclosure and replace three existi 2810 S 1ST ST AUSTIN |
— | 40 |
| 2026-09-22 | Remodel of existing conference rooms to add storefronts. includes complete renovation of 2 sets of upstairs restrooms and install of new ext 13201 MC CALLEN PASS AUSTIN |
— | 40 |
| 2026-09-22 | Interior renovation of existing office space b occupancy. removal of existing wall partitions doors frames. removal of existing ceiling tile 5920 W WILLIAM CANNON DR BLDG 1 UNIT 100 AUSTIN |
— | 40 |
| 2026-09-21 | We are going to install a channel letter storefront sign for a bakery in 2406 w parmer ln ste #98 austin tx 78727. this sign is made with fr 2406 W PARMER LN AUSTIN |
— | 40 |
| 2026-09-21 | Remodel of existing conference rooms to add storefronts. includes complete renovation of 2 sets of upstairs restrooms and install of new ext 13201 MC CALLEN PASS AUSTIN |
— | 40 |
| 2026-09-21 | Interior tenant finish-out and change of use from f-1 to personal improvement services for a fitness facility (crossfit sanity). work includ 1300 E 38TH HALF ST AUSTIN |
— | 40 |
| 2026-09-21 | Remodel of existing conference rooms to add storefronts. includes complete renovation of 2 sets of upstairs restrooms and install of new ext 13201 MC CALLEN PASS AUSTIN |
— | 40 |
| 2026-09-18 | Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skyligh 13212 N LAMAR BLVD AUSTIN |
— | 40 |
| 2026-09-18 | Small project - demo of finishes some millwork walls and doors light fixtures and remodel to include new finishes walls doors and millwork. 7600 CHEVY CHASE DR BLDG 2 UNIT 500 AUSTIN |
— | 40 |
| 2026-09-18 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4104 AUSTIN |
— | 40 |
| 2026-09-18 | Remodel of existing conference rooms to add storefronts. includes complete renovation of 2 sets of upstairs restrooms and install of new ext 13201 MC CALLEN PASS AUSTIN |
— | 40 |
| 2026-09-18 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4204 AUSTIN |
— | 40 |
| 2026-09-17 | The project consists of providing architectural and engineering design services for unit 267 fire damages reconstruction. based on the fire 3706 GOODWIN AVE UNIT 267 AUSTIN |
— | 40 |
| 2026-09-17 | Remodel of existing tenant finish out indoor entertainment facility into an indoor soccer facility 2026 089583 - concurrent reviews 10601 N LAMAR BLVD UNIT D AUSTIN |
— | 40 |
| 2026-09-17 | Interior tenant finish-out and change of use from f-1 to personal improvement services for a fitness facility (crossfit sanity). work includ 1300 E 38TH HALF ST AUSTIN |
— | 40 |
| 2026-09-16 | New tenant repairs (drywall interior doors electrical and plumbing fixtures). 2100 W WILLIAM CANNON DR UNIT H AUSTIN |
— | 40 |
| 2026-09-16 | Interior renovation of existing office space b occupancy. removal of existing wall partitions doors frames. removal of existing ceiling tile 5920 W WILLIAM CANNON DR BLDG 1 UNIT 100 AUSTIN |
— | 40 |
| 2026-09-15 | Change of use from retail to create an indoor sports and rec space with accessory concessions. 4501 W BRAKER LN UNIT C AUSTIN |
— | 40 |
| 2026-09-14 | Remodel of existing tenant finish out indoor entertainment facility into an indoor soccer facility 2026 089583 - concurrent reviews 10601 N LAMAR BLVD UNIT D AUSTIN |
— | 40 |
| 2026-09-14 | Interior renovation of existing office space b occupancy. removal of existing wall partitions doors frames. removal of existing ceiling tile 5920 W WILLIAM CANNON DR BLDG 1 UNIT 100 AUSTIN |
— | 40 |
| 2026-09-13 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4104 AUSTIN |
— | 40 |
| 2026-09-12 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4204 AUSTIN |
— | 40 |
| 2026-09-11 | Small project - build out of approximately 4060 sq ft one story building for mercantile use. demo of interior walls. new build out includes 13000 N IH 35 SVRD SB BLDG 11 UNIT 108 AUSTIN |
— | 40 |
| 2026-09-10 | Eplan: commercial expedited review - remodel to existing pard recreation - including roof replacement abatement restoration of windows door 200 ARNULFO ALONSO WAY AUSTIN |
— | 40 |
| 2026-09-10 | Replacing 2 windows like for like. existing multifamily. 1101 E PARMER LN UNIT 122 AUSTIN |
— | 35 |
| 2026-09-09 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4204 AUSTIN |
— | 40 |
| 2026-09-09 | Interior build-back and restoration of two fire-damaged apartment units. replacement of drywall insulation finishes cabinetry flooring doors 9345 E US 290 HWY SVRD EB UNIT 4104 AUSTIN |
— | 40 |
Want tomorrow's list at 7am?
Get Windows, Doors & Glazing alerts for Austin, TX — $49/mo