Bebart, Barry — Recent Permit Activity in Chicago, IL
Bebart, Barry pulled 5 commercial building permits in Chicago, IL recently, totaling $10,385,000 in reported project value. Work spans: Demolition, Electrical, Renovation & New Construction, HVAC & Mechanical, Plumbing, Windows, Doors & Glazing.
5recent permits
$10,385,000total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-07-27 | Self-cert 2019 cbc: wet lab east side phase 3 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazardous 5207 S HARPER AVE |
$3,500,000 | 95 |
| 2026-07-27 | Self-cert 2019 cbc: corridor and conference center - phase 1 of initial buildout on the 8th floor within an existing mixed-use building for 5207 S HARPER AVE |
$3,000,000 | 95 |
| 2026-07-27 | Self-cert 2019 cbc: quantum lab west side phase 2 of initial buildout on the 8th floor within an existing mixed-use building for a non-hazar 5207 S HARPER AVE |
$3,500,000 | 95 |
| 2026-06-24 | Self-cert 2019 cbrc: interior demolition of non-load bearing partitions, ventilation, electric, and plumbing on the 4th floor of an existing 8745 W HIGGINS RD |
$300,000 | 75 |
| 2026-06-18 | Self-cert 2019 cbrc: revision to building permit #101075768 to revise the ceiling at floors 53 and 54 per revised plans. scope limited to re 233 S WACKER DR |
$85,000 | 50 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all Chicago, IL permits — $99/mo