A & F Fire Protection CO — Recent Permit Activity in New York City, NY
A & F Fire Protection CO pulled 11 commercial building permits in New York City, NY recently, totaling $4,206,680 in reported project value. Work spans: Fire Protection, Renovation & New Construction.
11recent permits
$4,206,680total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-07-21 | Sprinkler/standpipe filing for new school building. 106 AVENUE X Brooklyn 11223 |
$1,000,000 | 90 |
| 2026-07-21 | Sprinkler/standpipe filing for new school building. 106 AVENUE X Brooklyn 11223 |
$1,000,000 | 90 |
| 2026-07-07 | Relocation of sprinkler heads and replacement of sprinkler heads due to changes to the ceiling types on level 600, 700, 1000. the sprinkler 530 WEST 120 STREET Manhattan 10027 |
$613,425 | 70 |
| 2026-06-25 | Gap factory (space #1160): modifications to existing sprinkler system in conjunction with retail build out. 139 FLATBUSH AVENUE BROOKLYN 11217 |
$51,673 | 55 |
| 2026-06-17 | Combined sprinkler/standpipe application filed to expand existing system into gym/classroom addition. maintain sprinkler coverage during con 7509 SHORE ROAD BROOKLYN 11209 |
$285,000 | 75 |
| 2026-06-17 | Combined sprinkler/standpipe application filed to expand existing system into gym/classroom addition. maintain sprinkler coverage during con 7509 SHORE ROAD BROOKLYN 11209 |
$285,000 | 75 |
| 2026-06-17 | Interior modifications / install fire sprinkler heads in conjunction with branch lines and mains to remain. no change in use, occupancy, or 200 BAYCHESTER AVENUE BRONX 10475 |
$40,020 | 35 |
| 2026-06-12 | Fire protection modifications on 8th floor as shown on plans filed herewith. no change in egress, occupancy, or use. 6 METROTECH BROOKLYN 11201 |
$178,781 | 50 |
| 2026-06-12 | Fire protection modifications on 8th floor as shown on plans filed herewith. no change in egress, occupancy, or use. 6 METROTECH BROOKLYN 11201 |
$178,781 | 50 |
| 2026-06-11 | Modification to existing sp system related to alteration including connection of new sp main/branch, new sp control valve assembly & connect 253 WEST 125 STREET MANHATTAN 10027 |
$287,000 | 70 |
| 2026-06-11 | Modification to existing sp system related to alteration including connection of new sp main/branch, new sp control valve assembly & connect 253 WEST 125 STREET MANHATTAN 10027 |
$287,000 | 70 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all New York City, NY permits — $99/mo