C C Controlled Combustion — Recent Permit Activity in New York City, NY
C C Controlled Combustion pulled 22 commercial building permits in New York City, NY recently, totaling $12,080,600 in reported project value. Work spans: Concrete & Masonry, Electrical, Renovation & New Construction, HVAC & Mechanical, Plumbing, Roofing.
22recent permits
$12,080,600total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-11-10 | General construction pertaining to installation of new gas fired & electric water heaters, storage tanks, booster pumps, and house pumps. in 300 EAST 54 STREET Manhattan 10022 |
$360,000 | 75 |
| 2026-11-04 | Filing for heating and ventilation repairs as per plans. no change in use, egress or occupancy. 645 WATER STREET Manhattan 10002 |
$460,000 | 70 |
| 2026-10-23 | Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no 145 EAST 73 STREET Manhattan 10021 |
$420,000 | 70 |
| 2026-10-21 | Replacement of existing mechanical equipment as shown on plans. no change to use and egress. 2560 BATCHELDER STREET Brooklyn 11235 |
$855,500 | 70 |
| 2026-10-20 | Remove existing oil tank. straight gas only. no change in means of egress use group or occupancy. 1680 YORK AVENUE Manhattan 10128 |
$26,000 | 35 |
| 2026-09-24 | Replacement of existing mechanical equipment (boilers, vacuum pumps, exhaust fans, valves) as shown on plans. no change to use and egress. 2540 BATCHELDER STREET Brooklyn 11235 |
$1,158,500 | 90 |
| 2026-09-24 | Replacement of existing mechanical equipment as shown on plans. no change to use and egress. 2520 BATCHELDER STREET Brooklyn 11235 |
$736,500 | 70 |
| 2026-09-23 | General construction for the installation of new heating plant equipment and chimney liner. no change in egress or occupancy. 60 EAST 96 STREET Manhattan 10128 |
$414,000 | 70 |
| 2026-09-22 | Replacement of existing steam control valves, steam radiator shut-off valves, heating and ventilation unit and steam traps 170 AVENUE C Manhattan 10009 |
$1,171,800 | 90 |
| 2026-09-22 | Replacement and installation of new mechaical equipment as shown on plans. 711 EAST 11 STREET Manhattan 10009 |
$656,900 | 70 |
| 2026-09-21 | Replacement and installation of new mechaical equipment as shown on plans. 411 EAST 10 STREET Manhattan 10009 |
$1,106,400 | 90 |
| 2026-09-21 | New furan flex chimney liner. no change in means of egres use group or occupancy. 400 EAST 14 STREET Manhattan 10009 |
$68,000 | 50 |
| 2026-08-12 | Remove (2) low pressure steam boilers & replace with (2) new low pressure hot water boilers. replace (2) new combination #2 oil/nat gas burn 26 WEST 61 STREET Manhattan 10023 |
$900,000 | 75 |
| 2026-08-11 | Install new chimney liner within existing chimney. no change in means of egress, use group, or occupancy. 26 WEST 61 STREET Manhattan 10023 |
$175,000 | 50 |
| 2026-08-10 | Replacement of exhaust fans, h&v units, radiators valves, and lobby heating system as shown on plans 770 FULTON STREET Brooklyn 11238 |
$1,458,000 | 90 |
| 2026-08-10 | Install new chimney liner in existing masonry chimney as per plans. install replacement chimney extension at roof as per plans. no change in 860 FIFTH AVENUE Manhattan 10065 |
$179,000 | 55 |
| 2026-08-07 | Install new chimney liner in existing masonry chimney as per plans. install replacement chimney extension at roof as per plans. no change in 860 FIFTH AVENUE Manhattan 10065 |
$179,000 | 55 |
| 2026-08-05 | Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burner. no change in means of egress use group or occupancy 35 EAST 10 STREET Manhattan 10003 |
$250,000 | 70 |
| 2026-07-30 | Mechanical work to remove and replace existing (2) boilers and associated burners. existingflue breeching tobe utilized. no change in egress 401 WEST 23 STREET Manhattan 10011 |
$50,000 | 50 |
| 2026-07-29 | Remove and replace existing (2) boilers and associated burners. existing flue breeching to be utilized. no change in egress, occupancy, or u 401 WEST 23 STREET Manhattan 10011 |
$760,000 | 70 |
| 2026-07-27 | Replacement of exhaust fans, h&v units, radiators valves, and lobby heating system as shown on plans 475 CARLTON AVENUE Brooklyn 11238 |
$651,000 | 70 |
| 2026-07-27 | Install (1) new 10 gage 304 stainless steel chimney liner in existing brick chimney. no change in means of egress, use group or occupancy. 51 EAST 90 STREET Manhattan 10128 |
$45,000 | 35 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all New York City, NY permits — $99/mo