Central Mechanical System — Recent Permit Activity in New York City, NY

Central Mechanical System pulled 16 commercial building permits in New York City, NY recently, totaling $13,477,962 in reported project value. Work spans: Concrete & Masonry, HVAC & Mechanical, Plumbing, Roofing.

16recent permits $13,477,962total reported value
IssuedProjectValueScore
2026-09-22 Provide 3 a/c split cooling systems to serve auditorium including all associated appurtenances. and exhaust fan installed on main roof for s
220 WEST 121 STREET Manhattan 10027
$1,200,00095
2026-08-18 Modify existing masonry opening within existing brick chimney to install new breeching duct as per mechanical drawings. patch repair existin
81-14 257 STREET Queens 11004
$400,00075
2026-08-06 K358 : installation of the mechanical system with heating system, ventilation system, air conditioning system. no change in use, egress or o
106 AVENUE X Brooklyn 11223
$3,000,00090
2026-08-06 M132_remove existing and provide new concrete pads, mechanical equipment and breeching serving boilers. provide new motorized dampers and lo
185 WADSWORTH AVENUE Manhattan 10033
$896,96375
2026-08-06 Provide a new emergency generator in the mechanical room. provide exhaust and make up air for ventilation inside fuel oil storage tank room.
411 PEARL STREET Manhattan 10038
$399,99970
2026-08-05 Mechanical work associated with the replacement of 3 existing boilers , new breeching, dampers, chemical feeds , steam valves and traps, new
89-30 114 STREET Queens 11418
$2,000,00095
2026-08-05 Modify existing masonry opening within existing brick chimney to install new breeching duct as per mechanical drawings. patch repair existin
81-14 257 STREET Queens 11004
$400,00075
2026-08-05 Ps 811m, installation of temporary chimney, steam, condensate, and make-up water piping to provide heat to the building during ex. heating p
466 WEST END AVENUE Manhattan 10024
$50,00055
2026-08-05 Ps 132m, installation of temporary chimney, steam, condensate, and make-up water piping to provide heat to the building during heating plant
185 WADSWORTH AVENUE Manhattan 10033
$50,00055
2026-08-05 Ps 911m, installation of temporary stacks, steam, condensate, and make-up water piping submitting on behalf of the contractor under an emerg
22 EAST 128 STREET Manhattan 10035
$50,00055
2026-08-05 General provisions for heating, air conditioning and ventilation: replacement of boiler breeching and installation of new chimney liner and
81-14 257 STREET Queens 11004
$200,00050
2026-08-05 Ps 177q, installation of temporary chimney, steam and condensate pipings and connect temporary emergency mobile boiler trailer to provide he
56-37 188 STREET Queens 11365
$30,00040
2026-06-26 213q - filing herewith for the mechanical work related to the flood elimination upgrade for this school. there will be no change in egress,
231-02 67 AVENUE Queens 11364
$4,711,00090
2026-06-26 Ps 213q, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction
231-02 67 AVENUE Queens 11364
$30,00040
2026-06-26 Ps 213q, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction
231-02 67 AVENUE Queens 11364
$30,00040
2026-06-26 K818, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler and provide heat to
1106 EAST 95 STREET Brooklyn 11236
$30,00040

Know every contractor's next jobsite — the morning after the permit is filed.
Track all New York City, NY permits — $99/mo