Volk Industrial Services — Recent Permit Activity in New York City, NY
Volk Industrial Services pulled 27 commercial building permits in New York City, NY recently, totaling $9,588,045 in reported project value. Work spans: Demolition, Renovation & New Construction, HVAC & Mechanical, Plumbing.
27recent permits
$9,588,045total reported value
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-10-01 | Interior renovation to existing 2 family dwelling, partition work, new flooring, all as per plan. no change in egress, use or occupancy unde 110 COVERT STREET Brooklyn 11207 |
$193,800 | 50 |
| 2026-09-28 | Interior non-structural demolition in conjunction with full demolition (by. sep. app) dob#m00869454-i1. 154 EAST 79 STREET Manhattan 10075 |
$30,000 | 35 |
| 2026-09-23 | Removal of non-load bearing interior partitions per enclosed drawings. beams & columns, floor tile, & plumbing risers to remain. there is no 509 MADISON AVENUE Manhattan 10022 |
$80,000 | 50 |
| 2026-09-22 | Full demolition of two story structure using hand held with mechanical to assist 1135 LEXINGTON AVENUE Manhattan 10075 |
$1,000,000 | 95 |
| 2026-09-22 | Full demolition of four story structure using hand held with mechanical to assist on grade. 150 EAST 79 STREET Manhattan 10075 |
$1,000,000 | 95 |
| 2026-09-21 | Full demolition of four story structure using hand held with mechanical to assist. 152 EAST 79 STREET Manhattan 10075 |
$1,000,000 | 95 |
| 2026-09-21 | Mechanical work to provide new heating & cooling systems for first & second floors as indicated on plans. 51 BOND STREET Manhattan 10012 |
$100,035 | 50 |
| 2026-09-18 | Full demolition of four story structure, using hand held with mechanical assist 1133 LEXINGTON AVENUE Manhattan 10075 |
$1,000,000 | 95 |
| 2026-08-17 | Partial demolition of a rear garage structure down to grade. 405 ARTHUR KILL ROAD Staten Island 10308 |
$34,300 | 35 |
| 2026-08-14 | Full demolition of four story structure, using hand held equipment with mechanical assist. 1059 2 AVENUE Manhattan 10022 |
$475,000 | 75 |
| 2026-08-13 | Mechanical work as shown on the plans. 5 HANOVER SQUARE Manhattan 10004 |
$450,000 | 70 |
| 2026-08-13 | Interior non-structural demo as shown on the plans. 5 HANOVER SQUARE Manhattan 10004 |
$70,000 | 50 |
| 2026-08-11 | Full demolition of five story structure using hand held and mechanical assist from within. 1356 1 AVENUE Manhattan 10021 |
$1,500,000 | 95 |
| 2026-08-04 | Full demolition of four story structure using hand held equipment with mechanical to assist 1061 2 AVENUE Manhattan 10022 |
$475,000 | 75 |
| 2026-08-04 | The plans enclosed depict the extent, sequence, means and methods for the proposed interior alteration of the 4 story building(s) located at 1133 LEXINGTON AVENUE Manhattan 10075 |
$30,000 | 35 |
| 2026-08-04 | The plans enclosed depict the extent, sequence, means and methods for the proposed interior alteration of the 4 story building(s) located at 1135 LEXINGTON AVENUE Manhattan 10075 |
$30,000 | 35 |
| 2026-07-30 | Full demolition of 6 story structure, using hand held and mechanical means to assist on grade only. 1651 FIRST AVENUE Manhattan 10028 |
$200,000 | 55 |
| 2026-07-30 | Chute to be installed to assist with lowering of debris. mechanical equipment to load out debris, and assist on grade with demo. 1651 FIRST AVENUE Manhattan 10028 |
$30,000 | 35 |
| 2026-07-29 | The plans enclosed depict the extent, sequence, means& methods for the proposed interior alteration of the 4 story building(s) located at 11 1131 LEXINGTON AVENUE Manhattan 10075 |
$30,000 | 35 |
| 2026-07-27 | Full demolition of 5 story building using hand held means. 1354 1 AVENUE Manhattan 10021 |
$250,000 | 70 |
| 2026-07-22 | Full demolition of four story structure, using hand held equipment. 1352 FIRST AVENUE Manhattan 10021 |
$200,000 | 50 |
| 2026-07-17 | Mpp#507: interior demolition of tenatnt fitouts that no longer occupy the buildingat floors 3 & 14. no removal of base building systesm ,s t 145 WEST 57 STREET Manhattan 10019 |
$72,750 | 50 |
| 2026-07-06 | Full demolition to a one story building 2018 BEDFORD AVENUE Brooklyn 11226 |
$70,000 | 50 |
| 2026-07-01 | Removal of mechanical equipment throughout the building as per plans. no change in use, egress or occupancy. 98 MONTAGUE STREET Brooklyn 11201 |
$92,160 | 50 |
| 2026-06-22 | Full demolition of 2 story building 558 METROPOLITAN AVENUE BROOKLYN 11211 |
$175,000 | 50 |
| 2026-06-17 | Full demolition of one story structure, using hand held and mechanical means to assist 182 MONTROSE AVENUE BROOKLYN 11206 |
$500,000 | 75 |
| 2026-06-15 | Full demolition of one story structure using hand held and mechanical to assist 172 MONTROSE AVENUE BROOKLYN 11206 |
$500,000 | 75 |
Know every contractor's next jobsite — the morning after the permit is filed.
Track all New York City, NY permits — $99/mo