JustPermitted PlaybookFAQGet Daily Alerts

Quality Control Electric Corporation — Recent Permit Activity in Sacramento County, CA

Quality Control Electric Corporation pulled 11 commercial building permits in Sacramento County, CA recently, totaling $140,100 in reported project value. Work spans: Electrical, HVAC & Mechanical, Plumbing.

11recent permits $140,100total reported value
IssuedProjectValueScore
2026-09-12 Main office: replace existing 100a overhead electrical service panel with new 100a equipment, like-for-like. existing 120/240v, single-phase
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
$2,00040
2026-08-14 Like-for-like replacement of the existing square d electrical subpanel serving the existing pool equipment room. install a new code-complian
8719 WOODMAN WAY, BLDG# Pool, SACRAMENTO, CA 95826
$3,50040
2026-08-13 (main) - main service panel c/o with new 600amp disconnect, (1) house panel c/o (2) 4 meter stacks at cabinet a & (2) 4 meter stacks at cabi
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
$33,70040
2026-08-13 (sub-case to main misc2026-00939) subpanel c/o for units 118,119,120,121,122,123,125,127
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
—40
2026-08-13 (sub-case to misc2026-00939) subpanel c/o for units 124,126,128,129,130,131,132,133
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
—40
2026-07-17 (main) - remove existing exterior meter bank and upgrading to square equipment. replacing existing sub panels inside units 148-155 with new
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
$38,20040
2026-07-17 (sub-case to misc2026-00418) replacing existing sub panels inside units 156-163 with new panels like for like replacement.
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
—40
2026-07-16 Removing all old zinsco 15 position exterior, and 21 socket meter bank, upgrading to square d, 15-meter banks, and upgrading all 21 zinsco s
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
$33,70040
2026-06-23 (main) removing all the old zinsco 17 position exterior meter banks upgrading to square d and upgrading all 17 zinsco sub panels and house p
4730 EL CAMINO AVE, CARMICHAEL, CA 95608
$29,00040
2026-06-23 (sub-case to misc2026-00937) removing all the old zinsco 17 position exterior meter banks upgrading to square d and upgrading all 17 zinsco
2465 WERBE LN, CARMICHAEL, CA 95608
—40
2026-06-23 (sub-case to misc2026-00937) removing all the old zinsco 17 position exterior meter banks upgrading to square d and upgrading all 17 zinsco
2463 WERBE LN, CARMICHAEL, CA 95608
—40

Know every contractor's next jobsite — the morning after the permit is filed.
Track all Sacramento County, CA permits — $99/mo