JustPermitted PlaybookFAQGet Daily Alerts

New Demolition Permits in San Francisco, CA — August 2026

27 commercial building permits relevant to demolition contractors were issued recently in San Francisco, CA, representing $75,647,585 in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.

27new permits $75,647,585total reported value $43,000,000largest project
IssuedProjectValueScore
2026-07-28 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017
600 California St
$85,00050
2026-07-24 Demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per
345 Spear St
$39,00035
2026-07-22 Level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new fur
235 02nd St
$2,900,00090
2026-07-16 20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm
345 California St
$750,00070
2026-07-10 9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fi
71 Stevenson St
$800,00070
2026-07-09 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire
650 California St
$1,184,49090
2026-07-09 29th floor: interior non-structural demolition on the 29th floor. ab017
55 Spear St
$45,00030
2026-07-08 Selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th
505 Brannan St
$94,00050
2026-07-02 Selective demolition of interior non structural elements. new framed partitions, doors, door frames, plumbing fixtures, replacement light fi
444 06th St
$509,27270
2026-06-25 Priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partia
1283 Delaware St
$1,500,00090
2026-06-25 Tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partitio
657 Mission St
$2,139,55685
2026-06-24 To comply with nov# 202654939: legalize unpermitted demolition of approximately 1400 sq ft at interior back section of the building. no foll
66 De Haro St
$7,50030
2026-06-23 Priority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing ove
733 Kearny St
$43,000,00090
2026-06-16 Interior improvement of existing warehouse space into coffee roasting facility. space will have a 200 sf tasting area but is not open to the
1434 Yosemite Av
$67,50045
2026-06-15 1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition o
1515 Sunnydale Av
$1,200,00090
2026-06-12 Demolition of structural deck between level 5 and 6. construct new stair.
221 Main St
$700,00065
2026-06-12 This restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fix
2001 37th Av
$209,20850
2026-06-11 Change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile
350 Kansas St
$1,500,00090
2026-06-11 Interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbin
115 Sansome St
$351,89570
2026-06-10 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is inclu
1 Embarcadero Center
$2,750,00090
2026-06-10 Level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doo
575 Market St
$500,00070
2026-06-10 Level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, m
505 Montgomery St
$100,00045
2026-06-09 Non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, lev
345 Montgomery St
$50,00050
2026-06-08 Demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation desi
485 Irwin St
$5,975,16990
2026-06-08 Demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation desi
465 Irwin St
$6,189,76090
2026-06-05 5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new
303 02nd St
$250,00070
2026-06-04 Floor 6 & 7: demolition of non-structural partitions and doors. new construction includes doors, partitions, ceilings, lighting, plumbing, a
680 Folsom St
$2,750,23590

Want tomorrow's list at 7am?
Get Demolition alerts for San Francisco, CA — $49/mo