New Demolition Permits in San Francisco, CA — August 2026
27 commercial building permits relevant to demolition contractors were issued recently in San Francisco, CA, representing $75,647,585 in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.
27new permits
$75,647,585total reported value
$43,000,000largest project
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-07-28 | 19/f & 20/f: interior demolition of non-structural partitions suspended ceiling, lighting, plumbing and finishes. ab-017 600 California St |
$85,000 | 50 |
| 2026-07-24 | Demolition of 1st floor walls, floors, ceiling, non-structural. also demo of millwork, finishes, doors, lights, act tiles and equipment. per 345 Spear St |
$39,000 | 35 |
| 2026-07-22 | Level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new fur 235 02nd St |
$2,900,000 | 90 |
| 2026-07-16 | 20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm 345 California St |
$750,000 | 70 |
| 2026-07-10 | 9th floor, suite 900: interior tenant improvement & demolition and new non-structural partitions, new muti-tenant corridor, new finishes, fi 71 Stevenson St |
$800,000 | 70 |
| 2026-07-09 | 27th floor: selective renovation and minor demolition. new construction includes floor, wall and ceiling finishes, power and lighting. fire 650 California St |
$1,184,490 | 90 |
| 2026-07-09 | 29th floor: interior non-structural demolition on the 29th floor. ab017 55 Spear St |
$45,000 | 30 |
| 2026-07-08 | Selective tenant improvement demolition of non structural partitons and doors. new lighting and finishes for open office on the 4th and 5th 505 Brannan St |
$94,000 | 50 |
| 2026-07-02 | Selective demolition of interior non structural elements. new framed partitions, doors, door frames, plumbing fixtures, replacement light fi 444 06th St |
$509,272 | 70 |
| 2026-06-25 | Priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partia 1283 Delaware St |
$1,500,000 | 90 |
| 2026-06-25 | Tenant improvemen on the 6th fl to include interior demolition of drinig fountain guards and storm drain riser. construction of new partitio 657 Mission St |
$2,139,556 | 85 |
| 2026-06-24 | To comply with nov# 202654939: legalize unpermitted demolition of approximately 1400 sq ft at interior back section of the building. no foll 66 De Haro St |
$7,500 | 30 |
| 2026-06-23 | Priority processing ab-004. demolition of existing facilities exposing existing garage roof structure. installation of new waterproofing ove 733 Kearny St |
$43,000,000 | 90 |
| 2026-06-16 | Interior improvement of existing warehouse space into coffee roasting facility. space will have a 200 sf tasting area but is not open to the 1434 Yosemite Av |
$67,500 | 45 |
| 2026-06-15 | 1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition o 1515 Sunnydale Av |
$1,200,000 | 90 |
| 2026-06-12 | Demolition of structural deck between level 5 and 6. construct new stair. 221 Main St |
$700,000 | 65 |
| 2026-06-12 | This restroom remodel project involves modification of 5 existing restrooms to include selective demolition and construction of restroom fix 2001 37th Av |
$209,208 | 50 |
| 2026-06-11 | Change of occupancy from a-2, m, b, s-1 to only b (tile showroom). tenant improvement permit of (e) two buildings on one lot for a (n) tile 350 Kansas St |
$1,500,000 | 90 |
| 2026-06-11 | Interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbin 115 Sansome St |
$351,895 | 70 |
| 2026-06-10 | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is inclu 1 Embarcadero Center |
$2,750,000 | 90 |
| 2026-06-10 | Level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doo 575 Market St |
$500,000 | 70 |
| 2026-06-10 | Level 21 and 22: interior non-structural "soft" demolition. removal of existing interior improvements including non-structural partitions, m 505 Montgomery St |
$100,000 | 45 |
| 2026-06-09 | Non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, lev 345 Montgomery St |
$50,000 | 50 |
| 2026-06-08 | Demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation desi 485 Irwin St |
$5,975,169 | 90 |
| 2026-06-08 | Demolition of (e) pavement & structurs. site grading, storm drainage, paving, sediment & erosion control. housekeeping pad & foundation desi 465 Irwin St |
$6,189,760 | 90 |
| 2026-06-05 | 5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new 303 02nd St |
$250,000 | 70 |
| 2026-06-04 | Floor 6 & 7: demolition of non-structural partitions and doors. new construction includes doors, partitions, ceilings, lighting, plumbing, a 680 Folsom St |
$2,750,235 | 90 |
Want tomorrow's list at 7am?