New Plumbing Permits in San Francisco, CA — October 2026
127 commercial building permits relevant to plumbing contractors were issued recently in San Francisco, CA, representing $78,742,958 in reported project value. Every project below was just permitted — meaning trade packages are being awarded right now.
127new permits
$78,742,958total reported value
$14,000,000largest project
| Issued | Project | Value | Score |
|---|---|---|---|
| 2026-10-01 | Apt c123 - bathroom remodeling take out the tub make a shower pan, plumbing valve change and angle stop. electrical will be the same. no lay 461 02nd St |
$15,000 | 35 |
| 2026-09-30 | Tenant interior work at ground floor & basement, adding new non-bearing interior partition walls, kitchenettes, cleaned up finishes, existin 370 Townsend St |
$128,545 | 45 |
| 2026-09-28 | Install new limited-use/limited access "passenger" - type elevator serving floors 1,2,3. install new vertical platform lift serving basement 1007 Market St |
$650,000 | 70 |
| 2026-09-24 | Existing interior office remodel. scope includes demo and construction of non structural partitions, ceilings, glazing, finishes, electrical 50 California St |
$3,942,870 | 90 |
| 2026-09-24 | Suit#1350: (e) interior office remodel, scope includes demo & construction of non-structural partitions, ceilings, glazing, finishes, electr 50 California St |
$859,574 | 70 |
| 2026-09-24 | Tenant improvement for 'e' retail store. demo of interior partition, new fixture, plumbing, mechanical, electrical work. new sales floor fix 50 Powell St |
$155,000 | 50 |
| 2026-09-23 | Alteration to (e) 2 story office buildilng. 1st phase of ti project, limited to construction of (n) building entry and new interior communic 534 04th St |
$210,000 | 50 |
| 2026-09-21 | Mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. install (3) new terminal units to meet new zoning plan 180 Howard St |
$125,000 | 50 |
| 2026-09-21 | Mechanical-install new low pressure duct & air distribution to meet new layout. install (3) new terminal units to meet new zoing plan. elect 180 Howard St |
$150,000 | 50 |
| 2026-09-21 | Ground and 2nd floor: demolition of existing tenant suite on the ground floor and selective demolition on the 2nd floor. no new plumbing fix 345 Spear St |
$22,000 | 35 |
| 2026-09-18 | Reopening mini market shevling and equipment installed and updated (e) bathroom to meet ada requirements. no change in plumbing fixtures. 2308 Market St |
$5,000 | 30 |
| 2026-09-18 | Revision to pa# 202101273419: add handsink @ cashier area relocated handsink at backrm. add mop back at water heater. remove 2 wheel stops a 319 Bay Shore Bl |
$1,300 | 30 |
| 2026-09-16 | Installation of 2 10,000 g 87 usts and 1 8,000 g 91-gas doulble wall usts. installation of all new double wall product, vapor and vent pipin 3400 Mission St |
$500,000 | 70 |
| 2026-09-16 | Change of occupancy and use of space from office (b) to karaoke lounge (a-2). minor demo of plumbing fixtures, millwork, rehanging restroom 739 Bryant St |
$3,000 | 35 |
| 2026-09-15 | Demolition of some (e) doors, construction of new full-height partitions, doors, millwork, finishes, associated electrical power/lightning d 600 Montgomery St |
$1,500,000 | 90 |
| 2026-09-15 | Unit #809: interior t.i. to replace plumbing fixtures. adding a local smoke alarm. no exterior work 1400 Geary Bl |
$98,000 | 45 |
| 2026-09-15 | 24th fl, ste 2405 interior replace plumbing fixtures, install grab bar backing; add local smoke alarm @ sleeping room and living room/entry 1400 Geary Bl |
$98,000 | 45 |
| 2026-09-15 | Rev to pa# 202510248138: no water heater needed to be installed. no mechnical work. 701 Geary St |
$1 | 30 |
| 2026-09-15 | Revision to pa# 202507211200: added civil drawings with sewer to permit drawings. 1830 Ocean Av |
$1 | 30 |
| 2026-09-14 | Renovation of suite 350, for new lab space. demo select partitions and doors. installation of new lab equipment and new lab furniture system 185 Berry St |
$500,000 | 70 |
| 2026-09-14 | Hvac upgrade of existing venue. provide the space with mechanical cooling. new vrf condenser unit, fan coil units, and px piping. no new arc 444 Battery St |
$50,000 | 50 |
| 2026-09-14 | Revision to bpa: 2026.0128.4718 - relocation of doors, deleted conference room, relocate kitchen cabinets + print room. no need plumbing fix 3450 California St |
$1 | 35 |
| 2026-09-11 | 43rd fl: soft demo of interior, replacement with new non bearing partitions, new lighting, new millwork and appliances, partial replacement 600 Montgomery St |
$624,369 | 70 |
| 2026-09-10 | 8th/f t.i. demo non-structural partition & install new partitions, dfh, interior glazing, millwork, break area plumbing, lighting & power/da 90 New Montgomery St |
$500,000 | 70 |
| 2026-09-10 | Ste #725 - tenant improvement to include interior demolition. construction of 4 new private offices. modification of existing finishes. no n 255 California St |
$185,000 | 50 |
| 2026-09-10 | Plumbing work t.i. on the 5th flr. ref#: 202606183492 400 Howard St |
$20,000 | 30 |
| 2026-09-09 | Interior t.i. within (e) commercial tenant space. relocation of door in employee bathroom. limited modifications to non-structural partition 671 Clay St |
$80,000 | 50 |
| 2026-09-09 | Suite 200,300.400,500 &700:relocate phone booths to open office area. addition of fire strobes tied to existing systems deferred. no mechani 8 California St |
$10,000 | 35 |
| 2026-09-09 | Installation of heat pump, refrigerant piping, fan coil unit, and ducting serving 2nd fl break room. 259 Post St |
$30,000 | 35 |
| 2026-09-08 | Change of use from retail to tea coffee shop (limited restaurant). add sinks and bar area to current retail space. install 3 compartment sin 1692 Haight St |
$48,000 | 35 |
| 2026-09-03 | 31st floor: restroom upgrade consisting of demo and construction of non-structural partitions, finishes, accessories, plumbing fixtures and 1 California St |
$112,286 | 45 |
| 2026-09-02 | Defferred mechanical, electrical, plumbing and food service. ref 202603268336 2222 Fillmore St |
$130,000 | 50 |
| 2026-09-02 | Removal of hand sink, capping water sewer lines connecting to sink. demo portion of half the wall to create a walk through. 2170 Mission St |
$7,500 | 30 |
| 2026-08-31 | 13/fl-ti and demo of non structrual elements including but not limited to interior partitions doors, finishes, ceilings, lighting mep and li 580 California St |
$966,322 | 70 |
| 2026-08-31 | Work in rooms #105, 106, 107, 108, 109. bathroom repair leaks, replace in kind. repair tiles work after plumbing work. ref. to the plumbing 2358 Lombard St |
$8,000 | 30 |
| 2026-08-27 | Suite 340-revision 202508143086- relocate the mop sink ice maker and selected plumbing fixtures and add raised platform to accommodate the ( 1737 Post St |
$2,500 | 30 |
| 2026-08-26 | 3486a mission: new non-load bearing interor partion wall. installation of new flooring with inernal cove base. install new electrical outlet 3486 Mission St |
$15,000 | 35 |
| 2026-08-25 | 5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling 1455 Market St |
$2,364,489 | 90 |
| 2026-08-25 | Ground floor-commercial ti - (n) bookstore and cafe at (e) vacant ground floor commercial space. (n) finishes and equipment. no structral wo 4512 03rd St |
$125,000 | 50 |
| 2026-08-21 | 3/fl- construction of (n) full height non load bearing paritions, doors, glazing millwork, finishes, plumbing, associated electrical power l 350 Rhode Island St |
$6,000,000 | 90 |
| 2026-08-20 | Interior tenant improvement for converstion of e coffee shop to a cocktail lounge w limited food preparation. scope includes interior demo, 101 New Montgomery St |
$188,000 | 50 |
| 2026-08-19 | Mechanical, plumbing and electrical drawings associated with approved t.i. building permit #202605040586 2230 Union St |
$50,000 | 50 |
| 2026-08-17 | Commerical restaurant area: remove tile concrete and soil, to repair plumbing drain, back fill moisture barrier, rebar and pour concrete upo 350 Judah St |
$6,000 | 35 |
| 2026-08-14 | Parking garage: to comply with nov 20260241: perform patchwork to drywall to enable plumbing repairs in parking lot. approx 128 sq ft. 5/8'' 1200 14th Av |
$5,000 | 30 |
| 2026-08-12 | Fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area with 838 Divisadero St |
$250,000 | 70 |
| 2026-08-11 | Ti for relocated fedex office store.change of occupancy from m to b. work includes new finishes, graphics, lighting, ceiling, new plumbing f 1563 Sloat Bl |
$485,637 | 70 |
| 2026-08-11 | 22nd fl interior tenant including new partitions, light fixtures, ceilings, millwork, and plumbing fixtures. mep and fire/life safety under 555 Mission St |
$446,192 | 65 |
| 2026-08-11 | Plumbing work t.i. on the 6th flr. ref#: 202605121069 400 Howard St |
$20,000 | 30 |
| 2026-08-10 | Replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater. 1 Zoo Rd |
$814,075 | 70 |
| 2026-08-10 | 5th and 6th floor: restroom upgrade by property owner. barrier removal, no change of use or occupancy. renovation of men's and women's restr 500 Washington St |
$100,000 | 50 |